Helium Refrigeration System (HRS) for Isotope Separation System (ISS) of ITER Fuel Cycle
The European Joint Undertaking for ITER and the Development of Fusion Energy ('Fusion for Energy')
The scope of this procurement procedure is the design, manufacturing, assembly, factory acceptance testing, transport and delivery of the Helium Refrigeration System (HRS) for the Isotope Separation System (ISS) within the Tritium Plant at ITER, based on Reversed Turbo-Brayton technology. The HRS will supply a cooling net power of approximately 1500 W at 18.5 K for the ISS of the ITER Tritium Plant. Optional scope: Option 1: factory performance testing; Option 2: technical assistance for on-site installation and final connection activities; Option 3: technical assistance for commissioning and site acceptance testing. Before the final call for tender, F4E may decide to remove certain options from the scope.
¿Cumple tu empresa los requisitos de esta licitación?
El motor de IA de Licia audita los pliegos administrativos (PCAP) y técnicos (PPT), evalúa tu solvencia técnica y económica conforme a la Ley 9/2017 y redacta un borrador de propuesta técnica.
Documentos oficiales del expediente
| Tipo de pliego | Documento |
|---|---|
| notice | Abrir en la fuente oficial ↗ |
| Adicional | Abrir en la fuente oficial ↗ |
Requisitos de solvencia y cláusulas del pliego
Licia analiza automáticamente mediante IA los pliegos (PCAP y PPT) para extraer los requisitos de solvencia técnica, solvencia económica, clasificación ROLECE, garantías y criterios de adjudicación con citas exactas del texto original.
Iniciar sesión para ver requisitos extraídosTodo contenido generado por IA es un borrador y requiere revisión humana antes de cualquier uso oficial.